Home / Registry / Record
Publishing rights & compliance · Illustrative record

Jesus for President

Religion & Public Life · Publication and program dossier

By Shane Claiborne

Master file reference · illustrativeGPRCC-ILL-2008-SC-269608
Cover of Jesus for President by Shane Claiborne
Representative publication · edition may varyFind this edition ↗ (opens in a new tab)
Illustrative case statusOn HoldScenario review date · 8 April 2008 – 8 May 2008 (release day unverified)
09Program records
39Review controls
23Open items

Master case overview

Master file reference
GPRCC-ILL-2008-SC-269608
Illustrative status
On Hold
Author / reference identity
Shane Claiborne
Subject area
Religion & Public Life
Work
Jesus for President
Review focus
Belief, interpretation, religious terminology and cross-cultural context. Program questions are selected for this subject area; no passage-level findings are asserted.
Proposed formats · scenario
Print and ebook
Proposed market scope · scenario
Selected international editions; territories to be defined in the rights matrix
Book release date
March 2008
Open Library ↗
Registration date · illustrative
8 March 2008 – 7 April 2008 (release day unverified)
Publication and registration basis
Jesus for President: Earliest dated catalog edition in the recorded first-publication year; editions may vary. The modeled registration is seven days after release. Where a source gives only a month or year, dates are shown as a range rather than inventing a day.
Modeled review date
8 April 2008 – 8 May 2008 (release day unverified)
Source basis
Library title, author, subject mapping and catalog program definitions; no manuscript examined.

Programs & status

This illustrative file covers 9 program records, 39 review controls and 23 open items. Select a program for its review details, document checklist and next action.

Requirements outstanding

Completed items are marked with a check. Required or clarification items must be resolved before this scenario can proceed.

16 / 39 completed
RCCROn Hold

Religious & Cultural Content Review

GPRCC-ILL-2008-SC-269608-RCCR

Review scope: cultural context, translation sensitivity, promotional framing.

3 review controls3 open items

Illustrative fee · USD$3,450

View review details ↓
IMRCOn Hold

International Media & Reputation Clearance File

GPRCC-ILL-2008-SC-269608-IMRC

Review scope: fact and opinion boundaries, non-affiliation wording, edition-specific publicity.

4 review controls2 open items

Illustrative fee · USD$4,050

View review details ↓
FCRSOn Hold

Fact-Checking & Research Substantiation File

GPRCC-ILL-2008-SC-269608-FCRS

Review scope: claim inventory, source traceability, data reproduction.

4 review controls1 open items

Illustrative fee · USD$2,300

View review details ↓
CHSMOn Hold

Cultural Heritage & Sacred Material Review

GPRCC-ILL-2008-SC-269608-CHSM

Review scope: material provenance, translation permissions, contextual presentation.

5 review controls3 open items

Illustrative fee · USD$2,900

View review details ↓
IDLCOn Hold

International Distribution & Licensing Compliance File

GPRCC-ILL-2008-SC-269608-IDLC

Review scope: agreement inventory, license boundaries, retail metadata.

5 review controls3 open items

Illustrative fee · USD$3,450

View review details ↓
TFRROn Hold

Translation & Foreign Rights Record

GPRCC-ILL-2008-SC-269608-TFRR

Review scope: translation grant, translator rights, terminology control.

4 review controls1 open items

Illustrative fee · USD$4,050

View review details ↓
AVRROn Hold

Audiobook, Narration & Voice Rights Record

GPRCC-ILL-2008-SC-269608-AVRR

Review scope: audio grant, performer agreement, pronunciation guidance.

4 review controls4 open items

Illustrative fee · USD$2,300

View review details ↓
IRTCOn Hold

International Rights & Territory Control File

GPRCC-ILL-2008-SC-269608-IRTC

Review scope: chain of title, territory and format scope, edition history.

5 review controls2 open items

Illustrative fee · USD$2,900

View review details ↓
CAVROn Hold

Cover, Artwork & Visual Asset Rights Record

GPRCC-ILL-2008-SC-269608-CAVR

Review scope: visual asset provenance, designer permissions, format reuse.

5 review controls4 open items

Illustrative fee · USD$3,600

View review details ↓
RCCR · Illustrative program record

Religious & Cultural Content Review

On Hold
Program reference
GPRCC-ILL-2008-SC-269608-RCCR
Master file
GPRCC-ILL-2008-SC-269608
Review scope
Print and ebook
Evidence position
0 of 3 controls complete in scenario
Publication context
Jesus for President by Shane Claiborne · Belief, interpretation, religious terminology and cross-cultural context

Review controls and outstanding items 3

  1. RCCR-101

    Cultural context

    For the proposed scope of Jesus for President, identify contextual notes needed for cross-cultural presentation. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Required · scenario. The scenario leaves this evidence item outstanding.

  2. RCCR-103

    Translation sensitivity

    For the proposed scope of Jesus for President, flag terms that could change meaning across languages. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Clarification needed · scenario. The scenario requires clarification of scope before this item can close.

  3. RCCR-105

    Promotional framing

    For the proposed scope of Jesus for President, preserve distinctions between discussion, criticism and affiliation. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Clarification needed · scenario. The scenario requires clarification of scope before this item can close.

Requirements to complete 3

  • Cultural context review briefRequiredThe scenario leaves this evidence item outstanding. Reference: RCCR-101.Awaiting submission · illustrative
  • Cultural terminology sheetClarification neededThe scenario requires clarification of scope before this item can close. Reference: RCCR-103.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Cross-cultural publicity reviewClarification neededThe scenario requires clarification of scope before this item can close. Reference: RCCR-105.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
Further-review standard. Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination. This is a modeled workflow, not a notice issued to the author.

↑ Back to programs

IMRC · Illustrative program record

International Media & Reputation Clearance File

On Hold
Program reference
GPRCC-ILL-2008-SC-269608-IMRC
Master file
GPRCC-ILL-2008-SC-269608
Review scope
Print and ebook
Evidence position
2 of 4 controls complete in scenario
Publication context
Jesus for President by Shane Claiborne · Belief, interpretation, religious terminology and cross-cultural context

Review controls and outstanding items 4

  1. IMRC-101

    Fact and opinion boundaries

    For the proposed scope of Jesus for President, separate editorial interpretation from independently checkable claims in proposed publicity. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Clarification needed · scenario. The scenario requires clarification of scope before this item can close.

  2. IMRC-102

    Non-affiliation wording

    For the proposed scope of Jesus for President, review references to people and institutions for unintended endorsement implications. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Required · scenario. The scenario leaves this evidence item outstanding.

  3. IMRC-104

    Edition-specific publicity

    For the proposed scope of Jesus for President, align retailer summaries and campaign copy with the edition proposed for release. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

  4. IMRC-105

    Escalation protocol

    For the proposed scope of Jesus for President, define which disputed statements would require specialist review before reuse. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

Requirements to complete 4

  • Publicity claim and source ledgerClarification neededThe scenario requires clarification of scope before this item can close. Reference: IMRC-101.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Non-affiliation wording sheetRequiredThe scenario leaves this evidence item outstanding. Reference: IMRC-102.Awaiting submission · illustrative
  • Campaign and jacket-copy comparisonCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: IMRC-104.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Media review escalation planCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: IMRC-105.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
Further-review standard. Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination. This is a modeled workflow, not a notice issued to the author.

↑ Back to programs

FCRS · Illustrative program record

Fact-Checking & Research Substantiation File

On Hold
Program reference
GPRCC-ILL-2008-SC-269608-FCRS
Master file
GPRCC-ILL-2008-SC-269608
Review scope
Print and ebook
Evidence position
3 of 4 controls complete in scenario
Publication context
Jesus for President by Shane Claiborne · Belief, interpretation, religious terminology and cross-cultural context

Review controls and outstanding items 4

  1. FCRS-101

    Claim inventory

    For the proposed scope of Jesus for President, classify factual, historical and statistical claims selected for the review scope. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

  2. FCRS-102

    Source traceability

    For the proposed scope of Jesus for President, record author, date, edition and location of supporting references. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

  3. FCRS-104

    Data reproduction

    For the proposed scope of Jesus for President, reconcile quoted figures with their source tables and units. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

  4. FCRS-105

    Correction control

    For the proposed scope of Jesus for President, track the edition in which a proposed correction would take effect. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Required · scenario. The scenario leaves this evidence item outstanding.

Requirements to complete 4

  • Claim-to-source ledgerCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: FCRS-101.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Source bibliography and locator indexCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: FCRS-102.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Statistical reproduction worksheetCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: FCRS-104.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Correction and version logRequiredThe scenario leaves this evidence item outstanding. Reference: FCRS-105.Awaiting submission · illustrative
Further-review standard. Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination. This is a modeled workflow, not a notice issued to the author.

↑ Back to programs

CHSM · Illustrative program record

Cultural Heritage & Sacred Material Review

On Hold
Program reference
GPRCC-ILL-2008-SC-269608-CHSM
Master file
GPRCC-ILL-2008-SC-269608
Review scope
Print and ebook
Evidence position
2 of 5 controls complete in scenario
Publication context
Jesus for President by Shane Claiborne · Belief, interpretation, religious terminology and cross-cultural context

Review controls and outstanding items 5

  1. CHSM-101

    Material provenance

    For the proposed scope of Jesus for President, identify provenance for any sacred or heritage material proposed for reuse. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

  2. CHSM-102

    Translation permissions

    For the proposed scope of Jesus for President, check the reuse scope of any copyrighted sacred-text translation. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Clarification needed · scenario. The scenario requires clarification of scope before this item can close.

  3. CHSM-103

    Contextual presentation

    For the proposed scope of Jesus for President, retain context and identify interpretive additions to quoted material. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

  4. CHSM-104

    Access restrictions

    For the proposed scope of Jesus for President, identify any material-specific access or reproduction conditions. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Required · scenario. The scenario leaves this evidence item outstanding.

  5. CHSM-105

    Credit conventions

    For the proposed scope of Jesus for President, document agreed credit lines for permitted reproductions. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Clarification needed · scenario. The scenario requires clarification of scope before this item can close.

Requirements to complete 5

  • Heritage material inventoryCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: CHSM-101.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Sacred-text permission matrixClarification neededThe scenario requires clarification of scope before this item can close. Reference: CHSM-102.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Context and attribution notesCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: CHSM-103.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Access-condition checklistRequiredThe scenario leaves this evidence item outstanding. Reference: CHSM-104.Awaiting submission · illustrative
  • Heritage credit-line sheetClarification neededThe scenario requires clarification of scope before this item can close. Reference: CHSM-105.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
Further-review standard. Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination. This is a modeled workflow, not a notice issued to the author.

↑ Back to programs

IDLC · Illustrative program record

International Distribution & Licensing Compliance File

On Hold
Program reference
GPRCC-ILL-2008-SC-269608-IDLC
Master file
GPRCC-ILL-2008-SC-269608
Review scope
Print and ebook
Evidence position
2 of 5 controls complete in scenario
Publication context
Jesus for President by Shane Claiborne · Belief, interpretation, religious terminology and cross-cultural context

Review controls and outstanding items 5

  1. IDLC-101

    Agreement inventory

    For the proposed scope of Jesus for President, identify proposed publisher, distributor and retail permissions for the named work. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Required · scenario. The scenario leaves this evidence item outstanding.

  2. IDLC-102

    License boundaries

    For the proposed scope of Jesus for President, map term, format, territory, language and sublicensing limits. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Clarification needed · scenario. The scenario requires clarification of scope before this item can close.

  3. IDLC-103

    Retail metadata

    For the proposed scope of Jesus for President, reconcile title, author credit, edition description and rights-holder attribution. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

  4. IDLC-104

    Accounting and reporting

    For the proposed scope of Jesus for President, document royalty reporting intervals, deductions and audit provisions. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

  5. IDLC-105

    Termination controls

    For the proposed scope of Jesus for President, define takedown, stock sell-off and rights reversion responsibilities. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Clarification needed · scenario. The scenario requires clarification of scope before this item can close.

Requirements to complete 5

  • Distribution agreement inventoryRequiredThe scenario leaves this evidence item outstanding. Reference: IDLC-101.Awaiting submission · illustrative
  • Distribution license matrixClarification neededThe scenario requires clarification of scope before this item can close. Reference: IDLC-102.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Retail metadata approval sheetCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: IDLC-103.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Royalty and reporting scheduleCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: IDLC-104.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Termination and reversion checklistClarification neededThe scenario requires clarification of scope before this item can close. Reference: IDLC-105.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
Further-review standard. Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination. This is a modeled workflow, not a notice issued to the author.

↑ Back to programs

TFRR · Illustrative program record

Translation & Foreign Rights Record

On Hold
Program reference
GPRCC-ILL-2008-SC-269608-TFRR
Master file
GPRCC-ILL-2008-SC-269608
Review scope
Print and ebook
Evidence position
3 of 4 controls complete in scenario
Publication context
Jesus for President by Shane Claiborne · Belief, interpretation, religious terminology and cross-cultural context

Review controls and outstanding items 4

  1. TFRR-101

    Translation grant

    For the proposed scope of Jesus for President, identify language, territory and format boundaries for a proposed translation. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

  2. TFRR-102

    Translator rights

    For the proposed scope of Jesus for President, document translator credit, assignment and permitted reuse. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

  3. TFRR-103

    Terminology control

    For the proposed scope of Jesus for President, prepare a terminology guide appropriate to the work’s subject area. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Required · scenario. The scenario leaves this evidence item outstanding.

  4. TFRR-105

    Foreign edition approval

    For the proposed scope of Jesus for President, define the approval process for translated covers and descriptions. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

Requirements to complete 4

  • Foreign-rights grant matrixCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: TFRR-101.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Translator agreement checklistCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: TFRR-102.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Translation terminology briefRequiredThe scenario leaves this evidence item outstanding. Reference: TFRR-103.Awaiting submission · illustrative
  • Foreign edition approval checklistCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: TFRR-105.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
Further-review standard. Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination. This is a modeled workflow, not a notice issued to the author.

↑ Back to programs

AVRR · Illustrative program record

Audiobook, Narration & Voice Rights Record

On Hold
Program reference
GPRCC-ILL-2008-SC-269608-AVRR
Master file
GPRCC-ILL-2008-SC-269608
Review scope
Print and ebook
Evidence position
0 of 4 controls complete in scenario
Publication context
Jesus for President by Shane Claiborne · Belief, interpretation, religious terminology and cross-cultural context

Review controls and outstanding items 4

  1. AVRR-101

    Audio grant

    For the proposed scope of Jesus for President, separate narration and audio distribution rights from print rights. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Required · scenario. The scenario leaves this evidence item outstanding.

  2. AVRR-102

    Performer agreement

    For the proposed scope of Jesus for President, define narrator credit, recording use and permitted reuse. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Clarification needed · scenario. The scenario requires clarification of scope before this item can close.

  3. AVRR-104

    Pronunciation guidance

    For the proposed scope of Jesus for President, prepare a subject-appropriate name and terminology pronunciation guide. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Clarification needed · scenario. The scenario requires clarification of scope before this item can close.

  4. AVRR-105

    Audio metadata

    For the proposed scope of Jesus for President, align abridgment labels, credits and edition descriptions. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Clarification needed · scenario. The scenario requires clarification of scope before this item can close.

Requirements to complete 4

  • Audio rights matrixRequiredThe scenario leaves this evidence item outstanding. Reference: AVRR-101.Awaiting submission · illustrative
  • Narrator agreement checklistClarification neededThe scenario requires clarification of scope before this item can close. Reference: AVRR-102.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Pronunciation and production briefClarification neededThe scenario requires clarification of scope before this item can close. Reference: AVRR-104.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Audio edition metadata sheetClarification neededThe scenario requires clarification of scope before this item can close. Reference: AVRR-105.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
Further-review standard. Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination. This is a modeled workflow, not a notice issued to the author.

↑ Back to programs

IRTC · Illustrative program record

International Rights & Territory Control File

On Hold
Program reference
GPRCC-ILL-2008-SC-269608-IRTC
Master file
GPRCC-ILL-2008-SC-269608
Review scope
Print and ebook
Evidence position
3 of 5 controls complete in scenario
Publication context
Jesus for President by Shane Claiborne · Belief, interpretation, religious terminology and cross-cultural context

Review controls and outstanding items 5

  1. IRTC-101

    Chain of title

    For the proposed scope of Jesus for President, identify the party authorized to grant rights and reconcile contributor assignments. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Clarification needed · scenario. The scenario requires clarification of scope before this item can close.

  2. IRTC-102

    Territory and format scope

    For the proposed scope of Jesus for President, map languages, formats, exclusivity and reserved territories without assuming worldwide rights. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Required · scenario. The scenario leaves this evidence item outstanding.

  3. IRTC-103

    Edition history

    For the proposed scope of Jesus for President, separate original publication rights from revised-edition and supplementary-material rights. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

  4. IRTC-104

    Quotation permissions

    For the proposed scope of Jesus for President, record the basis for reuse of any third-party extracts in the proposed edition. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

  5. IRTC-105

    Reversion and reservations

    For the proposed scope of Jesus for President, identify expired grants, reserved uses and conflicting options. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

Requirements to complete 5

  • Ownership and contributor assignment scheduleClarification neededThe scenario requires clarification of scope before this item can close. Reference: IRTC-101.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Territory, language and format matrixRequiredThe scenario leaves this evidence item outstanding. Reference: IRTC-102.Awaiting submission · illustrative
  • Edition and rights chronologyCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: IRTC-103.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Third-party permissions registerCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: IRTC-104.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Prior grants and reversion scheduleCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: IRTC-105.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
Further-review standard. Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination. This is a modeled workflow, not a notice issued to the author.

↑ Back to programs

CAVR · Illustrative program record

Cover, Artwork & Visual Asset Rights Record

On Hold
Program reference
GPRCC-ILL-2008-SC-269608-CAVR
Master file
GPRCC-ILL-2008-SC-269608
Review scope
Print and ebook
Evidence position
1 of 5 controls complete in scenario
Publication context
Jesus for President by Shane Claiborne · Belief, interpretation, religious terminology and cross-cultural context

Review controls and outstanding items 5

  1. CAVR-101

    Visual asset provenance

    For the proposed scope of Jesus for President, record the source and permitted use of cover and interior visual assets. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Clarification needed · scenario. The scenario requires clarification of scope before this item can close.

  2. CAVR-102

    Designer permissions

    For the proposed scope of Jesus for President, separate designer deliverables from third-party stock and font licenses. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Completed · scenario. The submitted evidence is accepted in this scenario; other requirements remain open.

  3. CAVR-103

    Format reuse

    For the proposed scope of Jesus for President, check proposed visual reuse across print, ebook, audio and promotion. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Clarification needed · scenario. The scenario requires clarification of scope before this item can close.

  4. CAVR-104

    Credit requirements

    For the proposed scope of Jesus for President, record mandatory image credits and license conditions. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Required · scenario. The scenario leaves this evidence item outstanding.

  5. CAVR-105

    Edition approval

    For the proposed scope of Jesus for President, track the approved cover version for each proposed edition. Apply this check in the context of belief, interpretation, religious terminology and cross-cultural context.

    Clarification needed · scenario. The scenario requires clarification of scope before this item can close.

Requirements to complete 5

  • Cover and artwork provenance registerClarification neededThe scenario requires clarification of scope before this item can close. Reference: CAVR-101.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Designer and supplier rights checklistCompletedThe submitted evidence is accepted in this scenario; other requirements remain open. Reference: CAVR-102.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Visual reuse permission matrixClarification neededThe scenario requires clarification of scope before this item can close. Reference: CAVR-103.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
  • Visual credit-line sheetRequiredThe scenario leaves this evidence item outstanding. Reference: CAVR-104.Awaiting submission · illustrative
  • Cover version approval logClarification neededThe scenario requires clarification of scope before this item can close. Reference: CAVR-105.Submission attempt 1 · 13 March 2008 – 12 April 2008 (release day unverified) · reviewed 8 April 2008 – 8 May 2008 (release day unverified) · illustrative
Further-review standard. Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination. This is a modeled workflow, not a notice issued to the author.

↑ Back to programs

Evidence and document index

A modeled evidence schedule for Jesus for President. These are document requirements and scenario states, not uploaded attachments or manuscript citations.

Control referenceDocument requirementScenario state
RCCR-101Cultural context review briefRequired · awaiting submission
RCCR-103Cultural terminology sheetClarification needed · submitted and reviewed
RCCR-105Cross-cultural publicity reviewClarification needed · submitted and reviewed
IMRC-101Publicity claim and source ledgerClarification needed · submitted and reviewed
IMRC-102Non-affiliation wording sheetRequired · awaiting submission
IMRC-104Campaign and jacket-copy comparisonCompleted · submitted and reviewed
IMRC-105Media review escalation planCompleted · submitted and reviewed
FCRS-101Claim-to-source ledgerCompleted · submitted and reviewed
FCRS-102Source bibliography and locator indexCompleted · submitted and reviewed
FCRS-104Statistical reproduction worksheetCompleted · submitted and reviewed
FCRS-105Correction and version logRequired · awaiting submission
CHSM-101Heritage material inventoryCompleted · submitted and reviewed
CHSM-102Sacred-text permission matrixClarification needed · submitted and reviewed
CHSM-103Context and attribution notesCompleted · submitted and reviewed
CHSM-104Access-condition checklistRequired · awaiting submission
CHSM-105Heritage credit-line sheetClarification needed · submitted and reviewed
IDLC-101Distribution agreement inventoryRequired · awaiting submission
IDLC-102Distribution license matrixClarification needed · submitted and reviewed
IDLC-103Retail metadata approval sheetCompleted · submitted and reviewed
IDLC-104Royalty and reporting scheduleCompleted · submitted and reviewed
IDLC-105Termination and reversion checklistClarification needed · submitted and reviewed
TFRR-101Foreign-rights grant matrixCompleted · submitted and reviewed
TFRR-102Translator agreement checklistCompleted · submitted and reviewed
TFRR-103Translation terminology briefRequired · awaiting submission
TFRR-105Foreign edition approval checklistCompleted · submitted and reviewed
AVRR-101Audio rights matrixRequired · awaiting submission
AVRR-102Narrator agreement checklistClarification needed · submitted and reviewed
AVRR-104Pronunciation and production briefClarification needed · submitted and reviewed
AVRR-105Audio edition metadata sheetClarification needed · submitted and reviewed
IRTC-101Ownership and contributor assignment scheduleClarification needed · submitted and reviewed
IRTC-102Territory, language and format matrixRequired · awaiting submission
IRTC-103Edition and rights chronologyCompleted · submitted and reviewed
IRTC-104Third-party permissions registerCompleted · submitted and reviewed
IRTC-105Prior grants and reversion scheduleCompleted · submitted and reviewed
CAVR-101Cover and artwork provenance registerClarification needed · submitted and reviewed
CAVR-102Designer and supplier rights checklistCompleted · submitted and reviewed
CAVR-103Visual reuse permission matrixClarification needed · submitted and reviewed
CAVR-104Visual credit-line sheetRequired · awaiting submission
CAVR-105Cover version approval logClarification needed · submitted and reviewed

Consolidated program status

ProgramIllustrative statusOpen itemsNext action
RCCROn Hold3Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination.
IMRCOn Hold2Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination.
FCRSOn Hold1Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination.
CHSMOn Hold3Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination.
IDLCOn Hold3Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination.
TFRROn Hold1Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination.
AVRROn Hold4Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination.
IRTCOn Hold2Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination.
CAVROn Hold4Supply each outstanding item, resolve scope questions and reconcile the evidence schedule before a further determination.

Illustrative review history

Generated milestones showing how this workflow could progress; these events did not occur for the named author.

Scenario dateModeled milestone
8 March 2008 – 7 April 2008 (release day unverified)Registration modeled
13 March 2008 – 12 April 2008 (release day unverified)Evidence package submitted · scenario
25 March 2008 – 24 April 2008 (release day unverified)Submitted evidence reviewed · scenario
8 April 2008 – 8 May 2008 (release day unverified)Completion request modeled

Program fee breakdown

The original illustrative case total is allocated across the 9 programs below. These example amounts are not payment receipts or quotations.

ProgramProgram nameAllocated fee (USD)
RCCRReligious & Cultural Content Review$3,450
IMRCInternational Media & Reputation Clearance File$4,050
FCRSFact-Checking & Research Substantiation File$2,300
CHSMCultural Heritage & Sacred Material Review$2,900
IDLCInternational Distribution & Licensing Compliance File$3,450
TFRRTranslation & Foreign Rights Record$4,050
AVRRAudiobook, Narration & Voice Rights Record$2,300
IRTCInternational Rights & Territory Control File$2,900
CAVRCover, Artwork & Visual Asset Rights Record$3,600

Total illustrative fees · USD$29,000

These restored case allocations are separate from the planning bands for new quotes. A written scope and quote determine the charge for an actual matter.

Next steps

  1. Reconcile outstanding documents against the program references in the evidence index.
  2. Prepare one coordinated completion package with edition, rights and source schedules.
  3. Review each open item and record whether it is resolved, requires clarification or needs specialist referral.
  4. Issue any subsequent determination only after the evidence review is complete.

This sequence describes the modeled on hold workflow only.

Record statements

Illustrative scope. The author and publication identify a library entry. Review details and registration milestones are synthetic; book publication dates are sourced; the page makes no claim that the author applied, supplied evidence, paid fees or received a determination.

Program references. GPRCC-ILL identifiers label scenarios, not statutory registrations. Document states and allocated fees are not proof of review or payment.

Publication context. The modeled status makes no finding about the publication’s legality, accuracy, ownership or suitability. Real determinations require a submitted record and an authorized review.

Author Case Library